Application: Data Center
Location: Quincy, Washington
Equipment Summary:
Labyrinth - Natural Ventilator1 Only 144” Wide x 120’ Long
12 Only 8’-6” Wide x 63’-1” Long
Project Profile:
Moffitt Corporation was approached bya local engineer and a local contractor toventilate a new data center in Quincy,Washington. Data centers produce alot of heat, without proper ventilation itcould be detrimental to the data hostersand the clients they serve.
The Labyrinth is one of many naturalventilation products that Moffitt offers. Itwas ideal for this project due to high airflow coefficient and its lightweightdesign. The Labyrinth is constructed ofaluminum, limiting the impact on the roofstructure.
Don’t let a lack of ventilation become afailure error. Let Moffitt design theventilation on your data center, it’s theNatural solution.
Client: Severstal
Application: Flat Roll Steel Mill
Location: Columbus, Mississippi
Equipment Summary:
Continuous Relief Ventilator Over 3,000
linear ft. provided and installed.
(16) 11 ft. x 75 ft. Labyrinths,
(100) 5’ W x 10’ H
Model - LV7590 Over 4,450 sq. ft.
provided and installed
(5) Wall Exhaust Fans Model PF7160
with Rainhoods
Project Profile
Moffitt has completed several projects for Severstal. From new construction to retrofit projects there is only one ventilation company for this Mississippi mill. Moffitt has the capabilities to handle projects beginning to end; all projects completed for Severstal have been turnkey. This plant also was the first plant to utilize Moffitt’s Computational Fluid Dynamics (CFD). CFD predicts flows and transfer of energy within a building as well as using thermal imaging to identify heat sources. Severstal’s Construction Manager, Jim Bell, fully endorses Moffitt Corporation, “In my past 20 years of Steel Mill Construction and being around the Steel Mills I haven’t put in anything besides Moffitt Ventilators.”
Cleint: World Kitchen
Application: Manufacturing Plant
Location: Corning, NY
Equipment Summary:
Qty 1 CRV110”-0” run of 180” size
Qty 35 Wall LouversAverage 121.88 sq. ft.
Project Profile:
World Kitchen, Corning, NY facility manufacturesdinnerware and baking accessories from a hub laminatingprocess from three glass layers. This process producesextreme amounts of heat. Moffitt was contacted by WorldKitchen to design and provide a natural ventilation system tocorrespond with a new furnace upgrade.
Equipment was produced at our manufacturing facilityMoffitt Fan, located in Leroy, NY only 90 miles from WorldKitchen facility. Our installation company MoffittMechanical installed the equipment providing World Kitchenwith a single source turn-key system.
Moffitt Mechanical was able to install the vent on the roofwithout removing the roof sheeting until installation wascomplete; this installation took place within an approximate22 work days. Moffitt erected the wind brand frames atground level. Following this, a GC crane was used to hoistand set base frames, while covering was in place, as well asthe pre-assembled wind band frames.
This vent is the largest vent Moffitt manufactures andassembles. This unique design approach allowed furnacework to continue within the facility without concern ofoutdoor elements entering facility or safety hazard fromwork occurring directly above heads.Contact the Moffitt team today to build a long lastingventilation solution.